Customization: | Available |
---|---|
Certification: | CE, ISO9001 |
Power Source: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. process time: 40-50min/batch, humidity of air should be 45-55% (The process time is based on the material of coating layer and products which need to coat, the temperature of air and humidity inside of the machine.).The weight of coated products is about 250kgs. 2. Capacity A. Peanuts 120kgs/ batch , coating time:40-50 minutes B. Raisin 120kgs/batch, coating time:60 minutes C. Almond 80kgs/ batch, coating time:60 minutes 3. Size: 2200*1550*2030mm. |